What affects the price
- Size and height: a double-storey exterior needs scaffolding or access equipment, which adds cost.
- Wall condition: crack filling, plaster patching, damp treatment and scraping back flaking paint are where most of the labour goes.
- Number of coats: a big colour change, or bare and patched plaster, needs a primer and extra coats.
- Paint quality: premium exterior paints cost more per litre but last noticeably longer in Cape Town's sun, rain and salty air.
- Detail work: fascias, windows, burglar bars, gates, doors and boundary walls all add time.
What a fair quote should include
A good quote lists the preparation (washing, crack repairs, patching and priming), the paint brand and product, the number of coats, what's included and excluded, how long the job will take and the guarantee. If a quote is just one number with no detail, ask what's in it.
Ways to keep it affordable
- Repaint before the paint is peeling badly. Less preparation means a lower price.
- Paint the most exposed walls (usually north and west facing) first if the budget is tight.
- Keep the same or a similar colour to reduce the number of coats.
- Combine interior and exterior work, or the house and the boundary walls, into one job.
FAQs
How long does it take to paint a house?
Most exteriors take three to seven working days, depending on size, repairs and the weather. Interiors are often quicker, room by room.
Do you repair cracks before painting?
Yes. Cracks are opened up, filled with a flexible filler and sealed, and loose plaster is patched before any paint goes on.
What's the best time of year to paint outside in Cape Town?
Late spring to autumn is ideal, when walls are dry and there's less rain. We don't paint exteriors in rain or when walls are damp.

